The Future of Cannop Ponds

Body

Working to keep Cannop Ponds safe for future generations

Cannop Ponds are two reservoirs within the Forest of Dean. The reservoirs were created in the 1820s through the construction of two dams across Cannop Brook. Both dams have had a long history of repairs to stop leaks and fill holes to prevent failure. The dams don’t meet modern requirements and so we are legally required to address the problems to ensure future safety. 

The more we looked at what we would have to do to fix the issues, the more we saw opportunities to improve the whole site for the future. We are working on a project to reduce the risk of future flood events and create lasting benefits for local people, visitors and wildlife.

A different approach is being taken at Upper and Lower Cannop, to reflect the opportunities that each Pond presents. The two will work together to bring benefits to the wider forest environment. Lower Cannop will continue to be a large area of open water. The dam will be strengthened, and the spillway will be replaced with a completely new structure. A more natural approach will be taken at Upper Cannop, which will be improved to become a haven for wildlife.

Join us at a public engagement event

Attend one of our informal sessions on Thursday 24 and Wednesday 30 September to see the latest plans and illustrations, meet members of the project team, speak to the experts and find out more about our proposed scheme.

Book your place

If you're unable to join us in person, you'll still be able to take part online through our virtual event space, which will be open from Thursday 24 September to Wednesday 22 October.

TBC
Image credit: Mott MacDonald

Managing the risk of future flooding

At Upper Cannop, we will reduce the risk of future flooding by lowering water levels, replacing the existing spillway with a new outlet channel, and improving the stability of the dam and northern causeway. The scheme will also include ongoing silt management and erosion protection, helping the Pond function more effectively during periods of heavy rainfall while ensuring the new infrastructure fits naturally within the surrounding landscape.

At Lower Cannop, we will improve the Pond’s ability to safely manage high water flows by constructing a larger spillway, lowering and extending the weir, and installing a permanent system to reduce water levels when maintenance is needed. Work will also be carried out to reduce seepage/leaking through the dam, to support the long-term safety and resilience of the site.

Enhancing conditions for wildlife

At Upper Cannop, we will create a more natural and wildlife-rich water’s edge with open water, marshes, reedbeds and wet woodland. New floating islands, meadows and grassland areas will provide valuable habitat for birds, pollinators and other wildlife. We will also make more space for nature by providing visitors with a dedicated all-access route, avoiding sensitive areas.

At Lower Cannop, we will enhance habitats around the Pond by improving the margins of the open water and installing bird and bat boxes. New eel passes at both Ponds will help species such as eels and lampreys move more freely along Cannop Brook, supporting healthier and better-connected freshwater ecosystems.

TBC
Image credit: Mott MacDonald
Three cyclists chatting as they stand with their bikes in the forest.

Improving the visitor experience

At Upper Cannop, we will create a more accessible and enjoyable visitor experience by improving access around the dam. Plans include a wider footbridge across the spillway, creating a new all-access trail and boardwalk in the area below the dam, providing a new wildlife viewing platform along the dam and more seating with a terraced picnic area. The Colliers Trail will also be rerouted away from the road to improve safety for walkers and cyclists.

At Lower Cannop, we will make it easier for people of all abilities to enjoy the site. Plans include a wider footbridge across the spillway and improved paths around the bridge and spillway. We will also be renewing existing and providing new accessible fishing platforms and associated access paths to allow fishing to continue for a wider audience. New interpretation of historic features such as the tramway, Bixslade Wharf and the stone works will help visitors discover the area's rich industrial heritage.

Have a question? 

We will keep this page up to date with information as the project progresses, or you can follow us on Facebook for more news.  

Below is a list of frequently asked questions about the Cannop Ponds project. If your question hasn't been answered, you can email the project team at cannopponds@forestryengland.uk

Useful links

Aerial shot of a drill rig on a dam at Cannop Ponds

Learn more about the history and timeline of the Cannop Ponds project.

A wooden boardwalk stretches over the water at Cannop Ponds. Blue sky with white fluffy clouds.

Cannop Ponds are two reservoirs within the Forest of Dean, originally created in the 1820s to supply a waterwheel at Parkend Ironworks.

Today, they are used for fishing by the...